Concorde Electronic City Masterplan

Concorde Electronic City is planned as a community of about 300 apartments in 2, 3 and 4 BHK on about 4 acres in Electronic City Phase 1, with about 5.25 lakh sq ft of built-up area. Concorde announced the project on 8 September 2026. The community is purely residential.

Project status

Upcoming - Concorde has not yet named this project or announced a price, and it is not registered with K-RERA as at 7 October 2026.

Concorde Electronic City master plan site layout
Concorde Electronic City master plan, indicative impression of an apartment community, not Concorde's drawing.

Concorde Electronic City Masterplan at a Glance

The land, the number of homes and the built-up total set the scale of the plan, and together they give a density that can be worked out from the figures in the table.

Item / Concorde Electronic City

LandAbout 4 acres
HomesAbout 300 apartments
Configurations2, 3 and 4 BHK
Built-up areaAbout 5.25 lakh sq ft, a project total
DensityAbout 75 homes an acre (300 homes on about 4 acres)
CharacterA purely residential community, planned with amenities and lifestyle features
Apartment sizes, towers and floorsConcorde has not announced apartment sizes, towers or floors
Layout planConcorde has not announced a layout plan or where the buildings sit, and the figure on this page is an indicative impression made for this site, not Concorde's drawing
ApprovalsConcorde has announced no approvals for this project as at 7 October 2026, including a plan sanction or an environmental clearance

The built-up figure is a project total, not a size per home. The one scale figure that follows from the announced numbers is density: 300 homes divided by 4 acres is 75 homes an acre, and the "about" on the land and the homes carries through to it.

How Concorde Plans Its Apartment Communities

The eight apartment communities in the table run from 47.1 to 105.5 homes an acre on each community's acres and homes, and the table sets them side by side as earlier projects. The table is a record of earlier communities and is not a statement about the plan for Concorde Electronic City.

CommunityWhereAcresHomesFloorsHomes an acre
Concorde ManhattansElectronic City Phase I13976-75.1
Concorde Midway CityElectronic City Phase 15.12408 to 9 floors47.1
Concorde Wind RushElectronic City, Singena Agrahara6534-89.0
Concorde SiennaHennur Main Road, North Bengaluru3260G+2886.7
Concorde EleveOld Madras Road2.16136G+3663.0
Concorde NeoThanisandra Main Road4.024242B+G+18105.5
Concorde MayfairBellary Road, Yelahanka3.30217G+1465.8
Concorde AntaresVidyaranyapura7592G+1684.6

Each density is the homes divided by the acres in the same row, so Manhattans is 976 divided by 13, or 75.1. At about 75 homes an acre, Concorde Electronic City falls inside that range, level with Concorde Manhattans in Electronic City Phase 1. On their K-RERA registered land and homes, the nearby projects Mahendra Arto Helix, Habulus Tranquil, Habulus Oasis Grove and Prestige Suncrest work out to between 72.8 and 91.4 homes an acre, so about 75 also sits inside the band of the corridor.

Height is chosen project by project. Across its five apartment projects registered since December 2023, floors run from G+14 to G+36, and Concorde Midway City in Electronic City Phase 1 has 8 to 9 floors. Concorde has not announced towers or floors for Concorde Electronic City, so none is assumed here. Open space is part of the plan too: the 75% open space is at Concorde Sienna, a community of 260 homes on 3 acres, and no open-space share has been announced for this project.

Reading a Sanctioned Plan

A sanctioned plan shows where every tower, road, parking level and open space sits on the land, and it is the drawing to check the project against. Once Concorde announces the project, read the plan itself rather than an illustration, and check the points in the table.

Look forWhy it matters
Number and position of towersShows how the land is shared between buildings and open ground
Open-space share and where it sitsTells you whether open space is a single block or scattered strips, and how it is counted
Entry and exit gates and internal road widthsDecide how residents and visitors move in and out
Parking levels and spaces per homeShows how parking is provided: basement, podium or surface
Setbacks and fire-engine accessShow the gap between buildings and the boundary
Amenity block and its phaseShows where it is built and in which phase it is delivered
Sanction date, reference and authorityConfirms what was approved, when, and by which authority
Water treatment, rainwater harvesting and power roomsShow where the services sit on the land

Check that the plan you are shown carries the same project name, promoter and location as the registration, and that the unit you are considering sits in a tower the plan shows.

What to Ask For at Announcement

Concorde Electronic City is planned on about 4 acres, and once Concorde announces the project these are the items worth having in writing:

  • The sanctioned plan. The approved layout with its sanction date, reference and the authority that granted it.
  • Towers and floors. How many towers, how many floors in each, and the height.
  • Open space. The share of the land kept open and how it is counted.
  • Parking. Spaces per home, the levels they sit on and whether they are charged separately.
  • Amenity block. Its size, its position on the plan and the phase in which it is delivered.
  • Phasing. Whether the community is built in one phase or several, and what is delivered when.
  • Registration. The K-RERA registration number, and that the plan in the registration matches the plan you are shown.

Confirm any registration before you pay anything. Register your interest on the contact page and you will hear when Concorde announces more about the project. The overview collects what is announced so far, the floor plans page covers apartment types, and the amenities page lists the amenities of its earlier communities.

Concorde Electronic City Master Plan FAQs

How big is Concorde Electronic City?

Concorde Electronic City is planned on about 4 acres with about 300 apartments and about 5.25 lakh sq ft of built-up area, which works out to about 75 homes an acre (300 homes on about 4 acres). Concorde has not announced the number of towers, floors or apartment sizes. The built-up figure is a project total, not a size per home, so it should not be divided by the number of apartments.

What has Concorde announced about towers, floors and amenities?

Concorde has not announced apartment sizes, towers or floors. The community is planned with amenities and lifestyle features; Concorde has not announced the list. For precedent, a 20,000 sq ft clubhouse and 23+ lifestyle amenities are at Concorde Manhattans in Electronic City Phase 1, and a 10,000 sq ft clubhouse with 75% open space is at Concorde Sienna on Hennur Main Road. Those are earlier projects and not a promise about this one, and the amenities page lists them with what to ask for.

What approvals has Concorde announced for Concorde Electronic City?

Concorde has announced no approvals for this project as at 7 October 2026, including a plan sanction or an environmental clearance. The project is also not registered with K-RERA as at 7 October 2026. Electronic City is outside the five Greater Bengaluru city corporations, and bringing it under the Greater Bengaluru Authority or the Bangalore Development Authority's planning area is under discussion (as at May 2026). Ask which local body and khata apply to the address once Concorde announces it, and ask for each approval in writing before you pay anything.

Is Concorde Electronic City RERA approved?

No. Concorde Electronic City is not registered with K-RERA as at 7 October 2026, and Concorde has announced no registration number or approvals for the project. Treat any RERA number or claim of RERA approval for this project with caution. Confirm any registration before you pay anything, and check that the project name, promoter and location on the registration match what you were shown.

What should I check before paying anything for Concorde Electronic City?

Check the K-RERA registration number and the promoter named on it, the sanctioned plan showing the towers, parking and open space, the land title and the khata, and the carpet and super built-up area of the home you are shown. Concorde has announced none of these for Concorde Electronic City as at 7 October 2026, so ask for each in writing once Concorde announces the project and compare the payment schedule against the proposed completion date registered with K-RERA.

Hear When Concorde Announces More

Register your interest and you will hear when Concorde announces more about the project.

Register your interest